11-08-2025, 10:44 AM
(11-02-2025, 01:23 PM)XORadmin Wrote:Ahh, now I understand. You've really helped me, thank you Thomas.(11-02-2025, 12:29 PM)andisyntz Wrote:(10-26-2025, 10:05 AM)XORadmin Wrote: Yes but the clock change now in the new pattern should definitely have impact.
I have noticed similar behaviour (track clock switching only at the end/Zero Cross of the loop) with the Combined Playback FX (regardless of the setup option: Pattern Launch Type: Normal or Sync):
Steps to reproduce:
1. New pattern
2. Pattern column 00: FX1: CHPB 009 (Combined Playback Normal)
3. Set track setup: Track Clock: /4
4. Play pattern
Expected behaviour: Track clock switches directly to track clock normal at step 00.
Current behaviour: Track clock only switches to track clock normal when transitioning from step 63 to step 00.
I hope that this problem and the one I described earlier can be solved somehow.
Thanks for your efforts.
CBPB 009 changes the clock indeed when the pattern is finished.
CBPB 109 changes the clock directly. <-- this is the one you need
From the manual (page 41):
"1XX Same as 0XX but it changes the clock immediately. Use this with caution as this might cause an un-synchronized pattern if being called somewhere in the middle of a pattern. If it’s being set on the first step then the new clock setting will run properly synchronized within this pattern. (Depending on if the last pattern was synchronized)
This works regardless of the running pattern order. This command on the first step will always been fetched before."
That does work if in SYNC mode if you cue a new pattern and then on the zero cross. In the next pattern you got the 'clock change now' command which takes care that it will run with the new clock setting.
I just tested it to be sure and it works as expected.

